Monday, November 11, 2024

Improve Model Efficiency - Part 5

Introduction

Previously, one of my blog posts was about how the outputs you create can cause performance issues in a Woodstock model. Specifically, the use of inventory-based outputs can seriously degrade matrix generation time because of the overhead they incur. Often, these outputs can be avoided through the use of REGIMES. 

I also wrote a blog post recently on conceptual models. This time, I want to continue considering conceptual models by going even more basic. Let's talk about conceptual models and what questions the model is supposed to answer. Poorly conceived models are doomed to be slow from the outset.

What Kind of Model is it?

In the hierarchical planning framework, forest planning models can be strategic, tactical or operational. Strategic planning models are focused on the concepts of sustainability, capital planning, silviculture investment, volume allocation and return on investment. The questions they answer are of the how, what and when variety, such as "when should we harvest?", "what stand should we harvest?" and "how should we manage these stands (thin or not)?", etc. Because it is strategic, many details of management are omitted or unavailable. And yet, clients often make choices that pretend to provide detail or certainty where none is warranted. By focusing on the questions at hand, you can pare back the conceptual model and in turn, improve model performance.

A Bad Conceptual Model

Years ago, a client approached me and said that he was told by a university professor (who shall remain nameless) that his stand-based Woodstock model was too large to solve because it relied on a Model II formulation. The professor said that a Model I formulation would be a better choice because it would not suffer the excessive size problem. Of course, this was nonsense! I explained that a properly formulated model with the same yield tables, actions and timing choices would yield the same solution, regardless of the formulation. Depending on the solver, a Model II formulation could be slower due to the higher number of transfer rows relative to a Model I formulation. Regardless, the problem had to be due to the way the client defined his actions. 

Timing Choices

It didn't take very long to start finding the culprits First, I checked the ACTIONS section:

*ACTION aCC Y Clearcut
*OPERABLE aCC
.MASK() _AGE >= 40

Next, I checked the CONTROL and LIFESPAN sections:

CONTROL
*LENGTH 40 ; 5-year periods

LIFESPAN
.MASK() 500

Nothing ever died in this model because the oldest permitted age class would be 2500 years! Every existing development type (DevType) older than 40 years generated a decision variable in every planning period, even though the existing yield tables stopped at age 150. This resulted in a bunch of decision variables representing very old stands and all with the same volume coefficients. Even if you could solve it, these decision variables represent poor choices and are never chosen.

Transitions

Because this was a stand-based model, I checked the TRANSITIONS section. Sure enough, they retained the StandID after the clearcut. 

TRANSITIONS
*CASE aCC
*SOURCE .MASK(_TH10(EX))
*TARGET .MASK(_TH10(RG)) 100

This prevented Woodstock from pooling acres into one of the regen DevTypes represented by a total of 12 ( yes, twelve!) yield tables. Instead of ending up with 12 DevTypes with multiple ages in each, they ended up with thousands and thousands of DevTypes that overwhelmed the matrix generator. The client asked about *COMPRESSTIME. I said it could eliminate some decision variables for each DevType, but the real problem was the excessive number of development types. By replacing the StandID theme with a generic ID (000000) associated with regen yield tables, the combinatorial explosion of DevTypes was averted. 

ACTIONS 
*ACTION aCC Y Clearcut
*OPERABLE aCC
.MASK() _AGE >= 40 AND _AGE <= 150

TRANSITIONS
*CASE aCC
*SOURCE .MASK(_TH10(EX))
*TARGET .MASK(_TH10(RG),_TH12(000000)) 100

The revised model ran in minutes and was trivial to solve. There was no need for *COMPRESSTIME.

What About the Model I Issue?

The reason the professor's Model I model ran and the Woodstock model didn't wasn't due to model formulation. The professor's model excluded a lot of choices because they were enumerated by hand. So even though the yield tables and DevTypes were the same in both models, the choices represented in the two models were different. After the changes were implemented and the Woodstock model ran, the Woodstock model yielded a slightly better solution. Not because Model II is a better formulation, but because it contained choices that the Model I model lacked. Thus, another reason why you should avoid (when possible) software switches like *COMPRESSTIME that blindly omit every 2nd, 3rd, 4th,... choice. 

Model Results Got You Stumped? Contact Me!

If you have a slow, cumbersome planning model, give me a call. I can review your model and make some suggestions for improvement. If the changes are extensive, we can design a training session around them. No one has more years of Woodstock experience.

Monday, April 29, 2024

Regimes - Why Aren't People Using Them?

Introduction

If memory serves me correctly, Remsoft introduced the Regimes module back in 2009. At first, it did not generate a lot of interest, despite criticisms from some circles that Model I was better than Model II. It was an extra module to license, and frankly, it wasn't the easiest syntax to wrap your head around. But times have changed!

Regimes is now part of the base Woodstock license. And while the syntax isn't the easiest thing to master, I've come to appreciate how Ugo was able to incorporate Model I structure into Woodstock's inherent Model II framework. As a user of FORPLAN, I remember how meshing Model I and Model II in a single model resulted in a very clumsy interface. It was no surprise that few people used FORPLAN v.2. But it has been 15 years since Woodstock Regimes was released, and yet I still don't see a lot of clients using it. This poll I conducted confirms that:

Poll conducted week of April 22, 2024

Why Use Regimes?

In Woodstock, when you specify an action, you provide the operability criteria (development type + condition) that allows the interpreter to generate a decision variable for each DevType-condition combination. If there are 5 operable DevTypes and 5 conditions (e.g. age) when each DevType can be harvested, the interpreter will generate 25 decision variables. The beauty of Regimes is that it allows you to create decision variables for a sequence of events, rather just a single activity. 

So, for what kinds of forest management decisions are Regimes suited? I've seen many models in the US South where commercial thinning is always followed by a fertilization one year later. While the timing of the thinning is a decision, the fertilization is not. Before Regimes, modeling CT + fert required inventory outputs with somewhat unintuitive DevType masks to make it work and report the fertilization acres in the correct period:

*SOURCE .MASK(_THx(14)) @AGE(16) _INVENT _AREA
; add 1 to age because of age counter

Additionally, by relying on an inventory output, it makes your model run slower.

*REGIME rThin
*OPERABLE rThin
   .MASK(_THx(00)) _AGE >= 13 AND _AGE <= 18

 *PRESCRIPTION rxTF (thin and fert)
   _RXPERIOD _ACTION   _ENTRY 
       0       aTH    _INITIAL
       1       aFT     _FINAL

Using a regime and prescription, reporting acres treated relies only on action-based outputs and so your model runs faster.

What About Reforestation?

The poll numbers are interesting for a few reasons.

Two-thirds of the respondents have specific planting actions in their models. From a conceptual modeling perspective, this implies that there are alternatives for each harvested area (timing, species, planting density, etc.).

No one simply attributes reforestation acres and costs to harvest actions. I know there are many Woodstock users in Canada, and few of them use 1-year planning periods. Again, this implies reforestation alternatives for each harvested area.

Roughly one-third of the respondents are using regimes to model reforestation. (Disclosure: respondents work for client organizations for which I developed models recently).

Over the last 20 years, I've witnessed a shift from silvicultural evaluation models to highly prescriptive models. By this I mean that 20 years ago, a lot of the models I built evaluated multiple planting densities for each harvested area. As a result, there needed to be multiple planting actions to represent the alternatives. And because planting was a choice, there needed to be constraints to enforce reforestation policies.

These days, however, while there may be different reforestation prescriptions across the forest, there is generally only one prescription for each harvest area. And in that case, there really isn't a need to have separate decision variables for planting. Instead, one or prescriptions in a reforestation regime that begins with final harvest is all that is required. Fewer decision variables = faster matrix generation and solution. And an added bonus is that the reforestation constraints may not be required either.

So Why Haven't Things Changed?

While I was at Remsoft, we always taught reforestation as a distinct activity from harvesting in the Modeling Fundamentals course. I suspect that many of the analysts we taught just replicated that conceptual modeling framework in the models they developed. And my experience has been that organizations rarely revamp models once developed.

Because models are rarely scrapped and rebuilt, I suspect most analysts these days inherited models built by some predecessor (who probably has now left the organization). There is never time to redesign a model so the same structure persists, with annual updates to the AREAS file (to account for depletions) and yield tables.

Ready for a Change? Contact Me!

If your models haven't been updated in a while, maybe it is time to rethink things. Together, we can design a new conceptual framework that is efficient and easier to debug if problems arise. And if you'd like to apply some targeted training (for say, Regimes or conceptual modeling) we can do that too!

What is the Big-M Method, and Why Should I Care?

The  Big-M method  is a common modeling technique used in  Mixed Integer Programming (MIP)  to represent  logical conditions  or  implicatio...